<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Florida Renovators</title>
	<atom:link href="http://www.floridarenovators.com/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://www.floridarenovators.com</link>
	<description>Your Source for Renovation done well</description>
	<lastBuildDate>Wed, 25 Aug 2010 10:53:04 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>What does it cost?</title>
		<link>http://www.floridarenovators.com/?p=394</link>
		<comments>http://www.floridarenovators.com/?p=394#comments</comments>
		<pubDate>Wed, 25 Aug 2010 10:50:52 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Training]]></category>

		<guid isPermaLink="false">http://www.floridarenovators.com/?p=394</guid>
		<description><![CDATA[How much does is cost? Why is it so expensive? You want how much? It cost a lot to be a licensed contractor. The state and insurance companies have their hands in our pockets. Contractors are bearers of bad news. We add things up. We include hidden items the owner doesn’t think of. We have [...]]]></description>
			<content:encoded><![CDATA[<p>How much does is cost? Why is it so expensive? You want how much?</p>
<p>It cost a lot to be a licensed contractor. The state and insurance companies have their hands in our pockets. Contractors are bearers of bad news. We add things up. We include hidden items the owner doesn’t think of. We have all cost on our shoulders. We also have the responsibility guaranteeing that the project gets completed. By federal law, contractors have to manage and train our personnel.</p>
<p>People who don’t work with their hands are critical of those who do. I always ask the client if they have hired a contractor before and been thru a remodeling project. The client has high expectations. Most people have never had to make payroll. Getting employees to be responsible and productive is a contractor’s nightmare. Cost of liability and workers compensation, FICA, training, lead paint, OSHA, safety gear adds up to a lot to the LABOR BURDEN RATE. The skilled employee cost a lot to keep going and must be productive. The productive hour includes company overhead, owner’s compensation, tools, equipment, office personnel, training, all insurance cost, all vehicle cost, etc. Contractors today have to put up with employee drug use and alcoholism. I don’t hire anyone with a back pack riding a bicycle without a drug test. Even in today’s economy finding qualified help is a problem. Employees don’t come pre-trained. With over 700 employees thru the years and as hands on contractor, I have stories to tell.  I tell home owners that there is nothing you can think of that I haven’t done! If only I had a clone.</p>
<p>Depending on the project, there is day after day after day of activity. In renovation work, you have to take the building apart first and prep the build for construction. You cost a lot of money- you get a lot. Home owners tend to simplify everything. Contractors are required by law to protect the public, work according to code; regulations approved plans, specifications, scope of work, and a contract. Then provide a warranty for everything for a year.  What warranty do attorneys and doctors provide?  Contractor competition is not an issue, comparable scope of the defining project work is. Remember the design professional is working for the building department. Here I got your permit!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=394</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Multifamily and Condo Managers Issues</title>
		<link>http://www.floridarenovators.com/?p=332</link>
		<comments>http://www.floridarenovators.com/?p=332#comments</comments>
		<pubDate>Mon, 26 Jul 2010 22:41:05 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Training]]></category>

		<guid isPermaLink="false">http://www.floridarenovators.com/?p=332</guid>
		<description><![CDATA[Taking care of a Condominium Complex building is different from taking care of a home! In addition to having to deal with all the owners, is the big building. Most multifamily buildings come in various sizes and several stories tall. Insurance requirements, building code issues and maintenance problems can be a full time job. Site [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Taking care of a Condominium Complex building is different from taking care of a home! In addition to having to deal with all the owners, is the big building.</strong></p>
<p><strong>Most multifamily buildings come in various sizes and several stories tall. Insurance requirements, building code issues and maintenance problems can be a full time job. Site drainage issues, elevators, fire sprinklers and parking issues command the president’s time on a full time basis. A written maintenance program along with existing construction plans documented and updated establishes a history report of activities that provide sustainability and saves money. I always suggest photo graphing all work that maintenance workers and contractors do. Establishing a photo report of repairs makes it easy for condominium managers to understand what has been accomplished. Having a written plan of maintenance activities establishes budgeting and systematic guidelines for taking care of the property investments. </strong></p>
<p><strong>There are constant changes in the existing building codes (there are currently 5 levels). National Fire Protection codes and life safety codes are also constantly changing and being updated. Insurance industry and the building fire regulations mandate changes in the codes. After a fire inspection, some insurance companies require modifications to the building to maintain current policy rates. Two main differences in multifamily as far as codes and insurance cost are, protected and non-protected structures. Many buildings built prior to 2001 Florida Building Code might have certain code deficiencies. These deficiencies are subject to interpretations. Show me the written requirements! </strong></p>
<p><strong>Other regulations that effect existing buildings are Lead Paint CFR 40, part 745. Any building built before 1978 require a RRP certified contractor that affects more than 6 square feet. Flood regulation can change in certain communities that might affect your project. Watch changes in the local flood ordinance and CRS ratings.  If mapping changes take place beware! Wind mitigation should also be understood. What wind zone is your project located in? If your building is more than 30 feet tall there is a 21 percent increase in wind force at the top. All outside material changes must have Florida Product approvals and permits. What is the flood zone designation for your project? In Florida, insurance carriers are required to have mitigation discounts for certain compliant structures. How was the building built and when, which tells us under what code! Ask your insurance carrier for their forms. Remember, only licensed professionals should fill out insurance inspection reports. So many times I talk to project reps. to find out they don’t know what was done and when. Document, document! </strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=332</wfw:commentRss>
		<slash:comments>6</slash:comments>
		</item>
		<item>
		<title>What is Design/Build?</title>
		<link>http://www.floridarenovators.com/?p=331</link>
		<comments>http://www.floridarenovators.com/?p=331#comments</comments>
		<pubDate>Mon, 26 Jul 2010 22:35:48 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Training]]></category>
		<category><![CDATA[design build contractor]]></category>

		<guid isPermaLink="false">http://www.floridarenovators.com/?p=331</guid>
		<description><![CDATA[What is Design/Build? You see this on the side of contractor’s trucks, what does Design/Build mean? Design/Build is a coordinated design costing process managed by a construction professional that has the capacity and the knowledge to establish project documentation on cost value basis in a presentation format to the project owner for design consideration and [...]]]></description>
			<content:encoded><![CDATA[<p>What is Design/Build?</p>
<p>You see this on the side of contractor’s trucks, what does</p>
<p><span style="text-decoration: underline;">Design/Build mean?</span> <strong>Design/Build is a coordinated design costing process managed by a construction professional that has the capacity and the knowledge to establish project documentation on cost value basis in a presentation format to the project owner for design consideration and approval. </strong></p>
<p>The construction professional has a coordinated relationship with a design professional or has a design professional in his employ. Some construction professionals have design capabilities. With the advent of computers and software construction professionals can accomplish design and redesigns of existing buildings. Just because you have a computer, software or a pencil doesn’t make you a designer.</p>
<p>Designing and redesigning buildings is a discipline that employs livable functions, architectural principals and livable space planning that result into architectural aesthetics and balance?</p>
<p>Normally the project owner receives an understanding of efforts that are undertaken to achieve valued design documentation. Design directives are usually formatted from a grocery list, or wish list of owner considerations.</p>
<p>It is the responsibility of the coordinating professional to establish design directives with approvals on a systematic basis (we need to go forward and get some were). The owner (usually the project owner or a subordinate) is looking for cost. Hey, I just need an estimate! The owner doesn’t want to be bogged down with decisions and is focused on cost. The design coordinator usually is trying to define the work with the understanding of code compliance, engineering, design approvals, specifications, and established scope of work. The owner of the project might not be necessarily savvy to the approval and document processes. The coordinating professional needs to read the project owners directives and objectives. Sometimes the owner vacillates on specifics and has unplanned objectives. The experienced coordinator prepares an outline of design/costing sequences. Hey, have I got a price for you! What price would you like?</p>
<p>I have often said.  ”Cost should only be based on specifics.” Mr. Owner, what is it that you want? The owner needs something tangible between himself and the contractor, otherwise it is best to give range costing.</p>
<p>I am getting bids, bids on what? I am getting bids from three contractors. Based on what?</p>
<p>There are two ways to go. Either design/build, or provide bid documents, period. Some contractor’s throw out numbers. How about $43,576.80? How about $42,600.00? The contractor will just leave something out.</p>
<p>Have I got a price for you!</p>
<p>The design costing process should be paid for on an exclusive basis by written agreement. The agreement should establish elementary wish list of design directives. The directives from the owner should be accomplished to a certain level, established and approved to have cost ranges and budgets accepted by the owner. Remember, every project is different; every process is unique and different. Every owner processes information differently.</p>
<p>Beware of indecisive owners who throughout complex specifics without thought or contemplations.</p>
<p>After design concepts are approved, and budgets are accepted, further definition and approvals should be accomplished.  Construction professionals should sell documentation not construction pricing.</p>
<p>Failures in this process result in contractual issues that haven’t been defined! Changes and extra’s with additional time result in undocumented planning!</p>
<p>This is not a Television Show!!!!!!!!!!</p>
<p>Lazy simple minded people should not attempt remodeling and building endeavors. Planning is paramount to a successful project. You don’t walk around a building and make design decide ions. Design decide ions are made from plans formatted of existing buildings or from site conditions established by licensed surveyors. Sometimes you need both. Some design professional fail to properly document existing conditions thoroughly.  You have to document what you got before you can redesign existing buildings. The designer is responsible for implementing the owners design objectives, building codes requirements and other regulations like zoning and density requirements.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=331</wfw:commentRss>
		<slash:comments>6</slash:comments>
		</item>
		<item>
		<title>Diversification is KEY</title>
		<link>http://www.floridarenovators.com/?p=1</link>
		<comments>http://www.floridarenovators.com/?p=1#comments</comments>
		<pubDate>Wed, 26 May 2010 13:31:39 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Training]]></category>

		<guid isPermaLink="false">http://www.floridarenovators.com/?p=1</guid>
		<description><![CDATA[  Contractors should be diversified to stay busy. One niche is not enough! Building room additions take time to design and get approvals. Installing windows, doors, and roofing are apparent exterior finish upgrades. Kitchens need design work and finish considerations. Invest in knowledge and capabilities. The articles I write are about contractors and home owners [...]]]></description>
			<content:encoded><![CDATA[<p> </p>
<p>Contractors should be diversified to stay busy. One niche is not enough! Building room additions take time to design and get approvals. Installing windows, doors, and roofing are apparent exterior finish upgrades. Kitchens need design work and finish considerations. Invest in knowledge and capabilities.</p>
<p>The articles I write are about contractors and home owners that want to remodel. These are pertinent aspects to discovering what is important and how to accomplish a systematic approach to getting remodeling done. This information comes from firsthand knowledge of hard knocks of dealing with home and building owners rebuilding and modifying buildings for 35 years. This information also comes with dealing with other contractors when presenting continuing education requirements for the state of Florida.</p>
<p>Diversification is key, in this economic climate. Remodeling and renovating is expensive. Hip shot deciding on a simple basis is a detriment to successful remodeling job. Everything I talk about in these articles is about planning. The next aspect is coordinating, control and understanding sequence of events necessary to complete the project on a value basis. Example: Floor covering is last. Demolition and preparation is first. Get the structure together. Get the building sealed in. Get all electrical, plumbing and HVAC completed, inspected, fixed and working before drywall is installed (point of no return). Understanding how interior finishes are applied, installed and coordinated. After all, this is hard money and <strong>NOT a TV</strong> <strong>SHOW</strong>.  I am sharing my experience. Unlike the Spam idiots,I am not selling anything ,but information! </p>
<p>TV shows don’t plan. They show kayos for public entertainment. Setting goals? You can’t set goals, why, because we don’t know what we are going to do. After surgery when will I feel better? How much will dinner cost? It depends on what you will order and eat. Defining the work is a <strong>PROCESS</strong>. How much will it cost? Cost for what? I have written a sequence of events that need to take place. Every project is different and unique. You will not find your project in a magazine. Make a list of all objectives (wish list). What is it you want to do? Prioritize your objectives. After design consideration based on existing plans and conceptual, budget the objectives list for preliminary considerations.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=1</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
		<item>
		<title>Florida Renovators Answers The Question &#8211; What is Green Build?</title>
		<link>http://www.floridarenovators.com/?p=315</link>
		<comments>http://www.floridarenovators.com/?p=315#comments</comments>
		<pubDate>Sun, 16 Aug 2009 16:47:37 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Green Building]]></category>
		<category><![CDATA[certified contractor]]></category>
		<category><![CDATA[Conservation Value]]></category>
		<category><![CDATA[Construction Efforts]]></category>
		<category><![CDATA[Construction Elements]]></category>
		<category><![CDATA[Dean Jarvis]]></category>
		<category><![CDATA[Demolition Material]]></category>
		<category><![CDATA[Efficient Construction]]></category>
		<category><![CDATA[Eighties]]></category>
		<category><![CDATA[Energy Awards]]></category>
		<category><![CDATA[Energy Efficiency]]></category>
		<category><![CDATA[Graduate Master Remodeler]]></category>
		<category><![CDATA[Green Build]]></category>
		<category><![CDATA[green build Florida]]></category>
		<category><![CDATA[green build tampa bay]]></category>
		<category><![CDATA[Green Construction]]></category>
		<category><![CDATA[Heat Recovery Systems]]></category>
		<category><![CDATA[Insurance Companies]]></category>
		<category><![CDATA[Light Gauge Steel]]></category>
		<category><![CDATA[Mitigation]]></category>
		<category><![CDATA[Nineties]]></category>
		<category><![CDATA[Permanence]]></category>
		<category><![CDATA[Pinellas Florida]]></category>
		<category><![CDATA[Recyclable Materials]]></category>
		<category><![CDATA[Renovators]]></category>
		<category><![CDATA[Residential Framing]]></category>
		<category><![CDATA[Solar Panels]]></category>
		<category><![CDATA[Tampa Bay]]></category>
		<category><![CDATA[Value Considerations]]></category>
		<category><![CDATA[Water Heating]]></category>
		<category><![CDATA[what is green building]]></category>

		<guid isPermaLink="false">http://floridarenovators.com/?p=315</guid>
		<description><![CDATA[What is green build? Having been in Florida for more than 40 years and enjoying the weather, I see the changes to the environment.  Green is concept of conservation value &#038; efforts. No one likes to write checks to the power company. Green is energy efficiency.]]></description>
			<content:encoded><![CDATA[<p><span style="color: #339966;"><strong>WHAT is GREEN BUILD?</strong></span></p>
<p>I was green for over 30 years and didn’t know it. In the late 70’s I got energy awards on new homes I built. In the early eighties I installed geo-thermo, heat recovery systems and I built solar panels for water heating and install solar glazing. In the nineties I started using light gauge steel for residential framing which is recyclable, lighter, stronger and more durable than wood.</p>
<p>What is green build? Having been in Florida for more than 40 years and enjoying the weather, I see the changes to the environment.  Green is concept of conservation value &amp; efforts. No one likes to write checks to the power company. Green is energy efficiency. Green is efficient construction efforts. Green is natural and durable sustainability. Green utilizes recyclable materials. Green is cost effective. Green also recycles used materials.</p>
<p><span style="color: #339966;"><strong>TO BUILD GREEN IS PROPER PLANNING</strong></span></p>
<p>Remember, electric power is not the only cost to a building. Building permanence and insurance cost are a prevailing cost as well. It is also important to document specific construction upgrades, both for value considerations as well as mitigation initiatives. Homes can be REBUILT. Homes can be recycled. All buildings can be recycled. Demolition material can be recycled and turned into electricity too. Banks, government and insurance companies don’t necessarily understand construction, therefore documentation and presentation of specific green specifics are warranted. The building owner want specific cost savings laid out in advance because simplistically the owner is looking for a quick obvious comparable cost analysis. Sometimes that is not always apparent and subject to ulterior conditions!<br />
 <strong><br />
 <span style="color: #339966;">FORMULATING A GREEN OUTLINE</span></strong></p>
<p>What are the construction elements of green build?  A list of important consideration should be outlined and budgeted.  A brief list of GREEN BUILD questions should be considered.</p>
<table border="0">
</table>
<table border="0" cellspacing="3" cellpadding="3" align="center">
<tbody>
<tr>
<th align="center" valign="middle" scope="col">
<p><span style="color: #339966;"><strong>How is the building used?</strong></span></p>
</th>
</tr>
</tbody>
</table>
<table border="0" cellspacing="3" cellpadding="3" align="center">
<tbody>
<tr>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>What functions are needed by the building inhabitants?</strong></span></th>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>What about maintenance and building durability?</strong></span></th>
</tr>
<tr>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>How does the building function?</strong></span></th>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>Can structure inhabitants modify their energy consumptions?</strong></span></th>
</tr>
<tr>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>What lighting, ventilation, heating, air conditioning is needed?</strong></span></th>
<th style="width: 500px;" align="center" valign="middle"><span style="color: #339966;"><strong>What about maintenance and building durability?</strong></span></th>
</tr>
</tbody>
</table>
<p><strong>A SYSTEMATIC APPROACH TO GREEN BUILD APPLICATIONS</strong></p>
<p>Documenting value?  How much does it cost? How long will it last? NAHB published a list of life expectancy of mechanical systems and finish longevity.</p>
<p>Factors that could be considered for outline</p>
<p>1. Initial implemented cost.<br />
 2. How is the system utilized<br />
 3. Durability factors<br />
 4. Environmental exposure factors<br />
 5. Abuses and maintenance factors<br />
 6. Modification and installation elements<br />
 7. Finish installation cost<br />
 8. Function, durability and value are not always equal considerations</p>
<p>Building owners questions and statements on green build considerations</p>
<ol>
<li>What kind of roof do I want?</li>
<li>How much more should I spend on my HVAC efficiency system?</li>
<li>How will it look?</li>
<li>How much insulation do I need?</li>
<li>What kind of windows and glass do I need.</li>
<li>But what will it look like. It’s got to look good</li>
<li>I want my cake and eat it too.</li>
<li>I can only make black or white decisions!</li>
<li>Engineering analysis takes time and documentation.</li>
</ol>
<p>What to do first</p>
<p>1. Fact: You can’t change what you got until you establish and document what you have.<br />
 2. Fact: What is in the building? How is it made? How much insulation is in the walls and ceilings? What kind of equipment is in the building? Has panel loads been established?<br />
 3. Fact: How much glass area? What kind of glazing is existing? Has the orientation of the building been established? How much square footage? How much wall area? How much ceiling area? How many doors? What is the thermo rating of the doors?<br />
 4. What is the established design temperature? Has total R-values for walls and roof structure been established?<br />
 5. What are the existing heat loads produce inside the structure? Duct work type and condenser distance from air-handler. What is the occupancy loads?<br />
 6. What is the average exterior temperature range?<br />
 7. Building location? Latitude? Average BTU ratings at Grade?</p>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=315</wfw:commentRss>
		<slash:comments>27</slash:comments>
		</item>
		<item>
		<title>Structural &amp; Foundation Repair</title>
		<link>http://www.floridarenovators.com/?p=289</link>
		<comments>http://www.floridarenovators.com/?p=289#comments</comments>
		<pubDate>Thu, 16 Jul 2009 19:05:05 +0000</pubDate>
		<dc:creator>Dean</dc:creator>
				<category><![CDATA[Structural & Foundation]]></category>
		<category><![CDATA[bolt Loose]]></category>
		<category><![CDATA[Corner connection]]></category>
		<category><![CDATA[Corner plate connection]]></category>
		<category><![CDATA[Corner post]]></category>
		<category><![CDATA[Depth doesn't meet coastal A Zone Requirements]]></category>
		<category><![CDATA[Existing beam]]></category>
		<category><![CDATA[Exposed bolt]]></category>
		<category><![CDATA[New pile connection]]></category>
		<category><![CDATA[New Protruding pile bolts]]></category>
		<category><![CDATA[Notched pile support]]></category>
		<category><![CDATA[Nunez Residence Indian Shores]]></category>
		<category><![CDATA[Original Cast iron pipe]]></category>
		<category><![CDATA[Over cut beam notch]]></category>
		<category><![CDATA[over drilled bolt hole]]></category>
		<category><![CDATA[Over notched beam with termite eaten beam]]></category>
		<category><![CDATA[Pile brace]]></category>
		<category><![CDATA[Pile depth inadequate]]></category>
		<category><![CDATA[Pile lack inbedment]]></category>
		<category><![CDATA[Pile support does not meet scourer depth]]></category>
		<category><![CDATA[Replacement]]></category>
		<category><![CDATA[Rotted unsupported beam joint]]></category>
		<category><![CDATA[Rusted connection plate]]></category>
		<category><![CDATA[Rusted plate]]></category>
		<category><![CDATA[Shallow footing shallow imbedment depth siding cut out]]></category>
		<category><![CDATA[termite eaten]]></category>
		<category><![CDATA[Termite eaten beam supports]]></category>
		<category><![CDATA[treads Loose]]></category>
		<category><![CDATA[Uneven notch]]></category>
		<category><![CDATA[Unprotected Plate]]></category>
		<category><![CDATA[unrecommended pile cap]]></category>

		<guid isPermaLink="false">http://floridarenovators.com/?p=289</guid>
		<description><![CDATA[Foundation support more than the structure. All loads are tied to the foundation. Soil condition should be considered and never taken for granted. Foundations on rock are different from organics or sand. The design professional understands loads. Load requirements are in the building codes. types of loads are based on wind, flood, live and dead [...]]]></description>
			<content:encoded><![CDATA[<h3>Foundation support more than the structure. All loads are tied to the foundation. Soil condition should be considered and never taken for granted. Foundations on rock are different from organics or sand. The design professional understands loads. Load requirements are in the building codes. types of loads are based on wind, flood, live and dead load. Point and uniform loading should be calculated by a design professional. Sometimes grade beams and pilings are needed. In florida, no basements. Sink holes are a problem in west central Florida. Structures in high wind areas should consider uplift and overturning. In Miami I saw whole second stories missing after hurricane Andrew!  </h3>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=289</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>RENOVATION &amp; REMODELING by: Dean Jarvis CGC/CGR/CR/CFM/CKBR/GMB/CGP/GMR Florida Renovators, Inc.</title>
		<link>http://www.floridarenovators.com/?p=275</link>
		<comments>http://www.floridarenovators.com/?p=275#comments</comments>
		<pubDate>Wed, 08 Jul 2009 19:41:55 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Renovation & Remodeling]]></category>
		<category><![CDATA[certified contractor]]></category>
		<category><![CDATA[CGC/CGR/CR/CFM/CKBR/GMB/CGP/GMR]]></category>
		<category><![CDATA[Clearwater]]></category>
		<category><![CDATA[Dean Jarvis]]></category>
		<category><![CDATA[design build contractor]]></category>
		<category><![CDATA[Largo]]></category>
		<category><![CDATA[master builder]]></category>
		<category><![CDATA[master remodeler]]></category>
		<category><![CDATA[Pinellas Florida]]></category>
		<category><![CDATA[remodeling]]></category>
		<category><![CDATA[renovation]]></category>
		<category><![CDATA[St Petersburg]]></category>
		<category><![CDATA[Tampa Bay]]></category>

		<guid isPermaLink="false">http://floridarenovators.com/?p=275</guid>
		<description><![CDATA[All remodeling projects are NOT created the same way! Remodeling is a process of gathering and establishing information for determination and approvals of the owner. Renovation projects are as different as the owners they serve. The process of formatting and documenting existing conditions for redesigning and adding on to homes and building is not for the indecisive client. A design/build specialist that is perceptive in grasping information and directives and who understands how to process the information in stages is important to a successful project. This involves a lot of effort for considerations from the building owner. Like construction cost design, considerations are never apparent UP FRONT.]]></description>
			<content:encoded><![CDATA[<div style="margin: 1ex;">
<div>
<p><span style="font-family: Calibri; font-size: small;"><strong>RENOVATION &amp; REMODELING ARTICLE </strong> DATE:  JULY 2009</span></p>
<p><span style="font-family: Calibri; font-size: small;">BY      Dean  Jarvis CGC/CGR/CR/CFM/CKBR/GMB/CGP/GMR</span></p>
<p><span style="font-family: Calibri; font-size: small;"> <strong> REMODELING IS A PROCESS, NOT A PRODUCT!</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">All remodeling projects are NOT created  the same way! Remodeling is a <strong>process</strong> of gathering and establishing  information for determination and approvals of the owner.  Renovation  projects are as different as the owners they serve. The process of formatting  and documenting existing conditions for redesigning and adding on to  homes and building is not for the indecisive client. A design/build  specialist that is perceptive in grasping information and directives  and who understands how to process the information in stages is important  to a successful project. This involves a lot of effort for considerations  from the building owner. Like construction cost design, considerations  are never apparent UP FRONT. </span></p>
<p><span style="font-family: Calibri; font-size: small;"> <strong> COMPARABLE SCENARIOS </strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Choosing a design/build specialist  is as difficult as deciding on a heart surgeon. All contractors are  not created equal!  All consumer groups tell you to get it in writing.  Documentation is everything. Watch out for good feelings and “this  will be wonderful” statements. Only what is in writing counts. This  is a bricks and mortar effort that is expensive to modify and change  as you go. So it’s imperative to document the planning effort as much  as possible.  A good design/build team has a basic written design plan.</span></p>
<p><span style="font-family: Calibri; font-size: small;"><strong> THE DESIGN PROCESS</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Designing accomplishes many things.  As built plans drawn with detail and to scale give an overview of the  floor plan from a birds I view. Floor plan changes should be considered  from a livability function first. Critical inches define space used  for bathrooms, kitchens, bedrooms and living areas.  All designers are  not the same. See FRI (Designers Responsibility requirements). Designers,  architects and engineers work for the building departments. Here is  your permit, please pay me.  Design cost is the best money spent because  it establishes specifics to define the work and saves the owner money  by delivering a quality project. A design/build team should be able  to show examples of completed projects. </span></p>
<p><span style="font-family: Calibri; font-size: small;"><strong> THE FLORIDA BUILDING CODE</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">THE FBC is more prescriptive than performance  driven, and contains numerous safety and fire codes. Entire sections  are devoted to administration and engineering requirements.  The  design professional is required to document specific wind loads and  other provisions. Mandated retrofits are required of existing structures.  There are 5 levels to the existing building code. Some electrical upgrades  are mandatory. Local zoning and flood ordinances are required in every  municipality. </span></p>
<p><span style="font-family: Calibri; font-size: small;"><strong> CONSTRUCTION COSTING</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Like designing, cost comes in stages.  Preliminary or <strong>budgeting costs</strong> are not comparable! A complete  set of working design drawings coupled with specifications and a written  scope of work is necessary when trying to accomplish <strong>project costing</strong>.  Framing plans, structural details, HVAC, Plumbing, electrical, interior  design elevations, foundation and engineering requirements and product  approvals of specified products is paramount to achieving complete project  costing.  A lot of contractors throw out numbers based on <strong>NO DOCUMENTATIONs</strong>,  beware. It takes work to compile specifics for costing. There is no  such thing as a <strong>FREE ESTIMATES</strong>. The word<strong><span style="text-decoration: underline;"> Estimate</span></strong> is a vague subjective term. Everyone wants cost, but cost for what?  Building officials and insurance companies don’t know cost. How much  per square foot? How much for red cars? How much a pound for cars? Cost  is arrived at. <strong>Cost is not known in advance!</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;"><strong> MATERIAL &amp; SPECIFICATION SELECTION </strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Most often contractors will use cost <strong> allowances</strong> not defined in the contract. These items should be defined  before being implemented.  Finish and fixture cost can be of any amount.   There is a big cost difference between installing tile versus installing  marble and stone.  Every effort should be taken to define finishes and  fixtures because it affects cost, time, preparation and coordination.</span></p>
<p><span style="font-family: Calibri; font-size: small;"> <strong> TIME &amp; SEQUENCE OF CONSTRUCTION </strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">How long will it take? When will it  be done? Doctor, when will I feel better?<strong> Do you have everything ordered? Do you have every fixture decided? Have  you changed your mind about anything?</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;"><strong>Construction must be done in a sequence  that is cost effective. An experience contractor manages the coordination  of the trades and works on a timely basis, otherwise, cost s are escalated.  Who pays for wasted labor time? </strong></span></p>
<p><span style="font-family: Calibri; font-size: small;"> <strong> CONTRACTORS OVERHEAD COST</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Its cost a lot of money to operate  a construction company. Insurance requirements are mandatory! Government  and insurance companies tightly control contractors thru licensing requirements.</span></p>
<p><span style="font-family: Calibri; font-size: small;">Workers Compensation, General Liability  Insurance and Federal Labor laws a large impact on how contractors operate.  Contractors have to train, manage, provide tools, trucks and equipment  for employees. Labor burden rates can exceed $35-$85 per hour for certain  types of work. It is cost effective to plan the work to get in and out  and not waste Labor Time.</span></p>
<p><span style="font-family: Calibri; font-size: small;"> <strong> IN SUMMARY</strong></span></p>
<p><span style="font-family: Calibri; font-size: small;">Spend the time and effort to facilitate  and document the project and you have substantiated <strong>CONSTRUCTION  VALUE!</strong></span></p>
</div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=275</wfw:commentRss>
		<slash:comments>128</slash:comments>
		</item>
		<item>
		<title>Dean Jarvis, of Florida Renovators, Inc. in Largo, Florida became a Graduate Master Remodeler (GMR)</title>
		<link>http://www.floridarenovators.com/?p=56</link>
		<comments>http://www.floridarenovators.com/?p=56#comments</comments>
		<pubDate>Fri, 21 Nov 2008 22:39:48 +0000</pubDate>
		<dc:creator>Dean Jarvis</dc:creator>
				<category><![CDATA[Company News]]></category>
		<category><![CDATA[Press Release]]></category>
		<category><![CDATA[Dean Jarvis]]></category>
		<category><![CDATA[Florida Renovators]]></category>
		<category><![CDATA[GMR]]></category>
		<category><![CDATA[Graduate Master Remodeler]]></category>
		<category><![CDATA[NAHB]]></category>
		<category><![CDATA[National Association of Home Builders]]></category>
		<category><![CDATA[Tampa Bay Builders Association]]></category>

		<guid isPermaLink="false">http://protrainer.info/FloridaRenovators/?p=56</guid>
		<description><![CDATA[Dean Jarvis, of Florida Renovators, Inc. in Largo, Florida became one of a select group of professional remodelers nationwide to attain a Graduate Master Remodeler (GMR) designation, identifying him as one of the remodeling industry's top professionals. Administered by The NAHB University of Housing, the GMR program is sponsored locally by the Tampa Bay Builders Association.]]></description>
			<content:encoded><![CDATA[<p><strong><span style="font-family: Verdana,Arial,Helvetica,sans-serif; font-size: small;">Company                                  News</span></strong></p>
<table border="0" cellspacing="1" cellpadding="1" width="100%">
<tbody>
<tr>
<td><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;"><strong>Press                                      Release</strong></span></td>
</tr>
<tr>
<td><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;">Contact:                                        Dean Jarvis<br />
Email: <a href="mailto:flrenovators@tampabay.rr.com">flrenovators@tampabay.rr.com</a> Website<a href="http://:www.floridarenovators.com/">:www.floridarenovators.com</a><br />
Phone: 727-531-9520 Fax: 727-536-2643 </span><span style="font-family: Arial,Helvetica,sans-serif;"><br />
</span></td>
</tr>
<tr>
<td><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;">For                                        immediate release</span><span style="font-family: Arial,Helvetica,sans-serif;"><br />
<span style="font-size: xx-small;">11-21-2008</span></span></p>
<h4><span style="font-family: Arial,Helvetica,sans-serif;">Dean                                        Jarvis of Florida Renovators, Inc, Earns                                        Graduate Master Remodeler Designation </span></h4>
<p><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;">Dean                                        Jarvis, of Florida Renovators, Inc. in Largo,                                        Florida became one of a select group of                                        professional remodelers nationwide to attain                                        a Graduate Master Remodeler (GMR) designation,                                        identifying him as one of the remodeling                                        industry&#8217;s top professionals. Administered                                        by The NAHB University of Housing, the GMR                                        program is sponsored locally by the <strong>Tampa                                        Bay Builders Association</strong>. </span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;"><img class="aligncenter size-full wp-image-59" title="gmr_500" src="http://www.floridarenovators.com/wp-content/uploads/2009/06/gmr_500.jpg" alt="gmr_500" width="500" height="221" /><br />
</span></p>
<p align="center"><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;"> </span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;">GMR                                        recognizes those remodelers who have shown                                        a commitment to educational excellence,                                        demonstrated exceptional business integrity,                                        and established longevity in the remodeling                                        industry.</span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;"> To earn the GMR designation, a remodeler                                        must be an active Certified Graduate Remodeler                                        (CGR) for at least nine years, posses 15                                        years of remodeling experience, complete                                        an intensive series of industry-specific                                        education courses, provide letters of recommendation,                                        proof of licensing and insurance and adhere                                        to a strict Code of Ethics. GMR stands for                                        dedication to excellence, experience and                                        professionalism within the remodeling industry. </span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif; font-size: x-small;">The                                        GMR program represents a graduate master                                        level of remodeling experience and educational                                        excellence which will be continued throughout                                        Dean Jarvis&#8217; career. The GMR program requires                                        all graduates to maintain their designation                                        by completing 12 hours of continuing education                                        every three years. </span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif;"><strong>Mr.                                        Jarvis is also a certified Graduate Builder                                        and a Certified Graduate Remodeler (GMR)                                        accredied by the National Association of                                        Home Builders. Mr. Jarvis is additionally                                        accredited by the National Association of                                        the Remodeling Industry, as a Certified                                        Kitchen &amp; Bath Remodeler. He is a certified                                        Green Build Professional and he holds another                                        national accreditation as a Flood Plain                                        Structural Mitigation Specialist. Mr. Jarvis                                        has been awarded state honors such as the                                        Remodeler of the Year Award in 2000 by the                                        Florida Home Builder’s Association,                                        and Mr. Jarvis was awarded the prestigious                                        2nd Place Award, for Commercial Buillding                                        Specialty by the National Association of                                        the Remodeling Industry </strong></span></p>
<p><span style="font-family: Arial,Helvetica,sans-serif;"><strong><span style="font-size: x-small;">ABOUT                                        NAHB</span></strong><span style="font-size: x-small;">: T<em>he                                        National Association of Home Builders is                                        a Washington-based trade association representing                                        more than 235,000 members involved in home                                        building, remodeling, multifamily construction,                                        property management, subcontracting, design,                                        housing finance, building product manufacturing                                        and other aspects of residential and light                                        commercial construction. Known as “the                                        voice of the housing industry,&#8221; NAHB                                        is affiliated with more than 800 state and                                        local home builders associations around                                        the country. NAHB&#8217;s builder members construct                                        about 80 percent of the new homes constructed                                        each year, making housing one of the largest                                        and most powerful engines of economic growth                                        in the country.</em></span></span></td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://www.floridarenovators.com/?feed=rss2&amp;p=56</wfw:commentRss>
		<slash:comments>51</slash:comments>
		</item>
	</channel>
</rss>
